New York Data Centers
- Manhattan’s 60 Hudson Street and 111 Eighth Avenue (now Google-owned) are among the most interconnected buildings on Earth — critical nodes for global internet traffic.
- ConEdison rates of 20–25¢/kWh make NYC the most expensive data center market in the country, while upstate utilities offer 6–8¢/kWh near Niagara Falls hydropower.
- A 2022–2024 moratorium on fossil-fueled crypto mining reshaped the upstate pipeline without affecting traditional data centers.
Manhattan Carrier Hotels to Hudson Valley Campuses
New York’s data center geography reflects a stark economic divide. Lower Manhattan hosts iconic carrier hotels — 60 Hudson Street and 111 Eighth Avenue — where financial institutions pay premium rates for sub-millisecond latency to Wall Street. The Hudson Valley has emerged as a lower-cost alternative, with operators in Westchester and Orange counties building campuses that maintain fiber links to NYC at a fraction of Manhattan real estate costs. Upstate New York attracts operators seeking cheap hydroelectric power near Niagara Falls and Syracuse, though the 2022–2024 moratorium on fossil-fueled crypto mining reshuffled some of that pipeline.
New York’s Data Center Counties
' . $county_count . ' New York counties have tracked facilities, spanning from dense urban colocation in Manhattan to hyperscale builds along the I-87 corridor. The split mirrors the state’s broader economic geography: downstate pays for proximity and connectivity; upstate competes on cost and clean energy.
| County | Facilities | Capacity (MW) | Top Operators |
|---|---|---|---|
| New York | 49 | 45 | Multi-tenant carrier hotel (Digital Realty, CoreSite, and other carrier/telecom tenants), Multi-tenant carrier hotel (Hudson Interxchange, Digital Realty, DataBank, Equinix, and 100+ telecom tenants), Digital Realty +30 more |
| Erie | 17 | 358 | Digihost (Digi Power X), Frontier, H5 Data Centers +13 more |
| Niagara | 14 | 1,056 | 9 Lives Digital Group (9LDG), American Bitcoin (Hut 8), Blockfusion +6 more |
| Albany | 13 | 4 | Lumen Technologies, Turnkey, Meta +8 more |
| Westchester | 13 | — | Equinix, Evocative, TierPoint +7 more |
| Rockland | 12 | 96 | Bloomberg LP, DataBank, fifteenfortyseven Critical Systems Realty +6 more |
| Suffolk | 11 | 2 | 365 Data Centers, Cable, Gotham Bus +7 more |
| Onondaga | 11 | 300 | Ranalli, Syracuse University, ISafeTECH +6 more |
| Monroe | 9 | 4 | Landmax, Lumen Technologies, CentriLogic +5 more |
| Nassau | 8 | 4 | Continuity Centers, Crown Castle, Global Enterprise Technologies Inc. +5 more |
| Kings | 4 | 10 | Dataverge, Cologix, Industry City Associates +1 more |
| Genesee | 3 | 1,000 | Stream Data Centers |
| St. Lawrence | 3 | 266 | Coinmint, NTT, Clarkson University |
| Dutchess | 3 | 260 | IBM, 1 Gig Data Center, CyrusOne |
| Richmond | 3 | 10 | Merrill Lynch, Telehouse |
| Broome | 3 | 100 | Lumen, Global AI |
| Seneca | 2 | — | FirstLight |
| Tompkins | 2 | 800 | TeraWulf |
| Lewis | 2 | 45 | Iron Mountain |
| Clinton | 1 | 17 | NewYork GreenCloud |
| Oneida | 1 | — | Northland Communications |
| Franklin | 1 | — | 2CRSi |
| Saratoga | 1 | 2 | DotBlock DataCenter |
| Saint Lawrence | 1 | — | Clarkson University |
| Yates | 1 | 106 | Greenidge Generation |
| Herkimer | 1 | 200 | Turin Management |
Wall Street, Big Tech, and the Latency Premium
New York’s operator mix is unlike any other market. Financial institutions drive demand in Manhattan and northern New Jersey, paying enormous premiums for microseconds of latency advantage. Equinix, Digital Realty, and Sabey Data Centers provide the colocation infrastructure. Google’s ownership of the iconic 111 Eighth Avenue symbolizes big tech’s presence, while the Hudson Valley attracts operators like EdgeConneX and Stack Infrastructure building for NYC-adjacent demand at lower cost.
| # | Operator | Facilities | Capacity (MW) | Locations |
|---|---|---|---|---|
| 1 | Lumen | 13 | — | Albany, Binghamton, New York, Garden City |
| 2 | Verizon | 10 | — | New York, Brentwood, Amherst, Rochester |
| 3 | DataBank | 8 | 85 | Pearl River, Orangeburg, Briarcliff, Amhurst |
| 4 | FirstLight | 6 | — | Albany, Rochester, Romulus, Syracuse |
| 5 | Lumen Technologies | 5 | — | Albany, Latham, Buffalo, New York |
| 6 | TeraWulf | 5 | 1,435 | Lansing, Barker, Niagara, Tompkins |
| 7 | Telehouse | 5 | 14 | New York, Staten Island |
| 8 | Stream Data Centers | 4 | 1,000 | Alabama, Syracuse |
| 9 | Blockfusion | 3 | 46 | Niagara Falls |
| 10 | Digital Realty | 3 | — | New York, Chappaqua |
| 11 | H5 Data Centers | 3 | — | Buffalo, Lockport |
| 12 | TierPoint | 2 | — | Hawthorne |
| 13 | FiberMedia | 2 | — | New York, Chappaqua |
| 14 | Zayo Group | 2 | — | New York |
| 15 | Northland Communications | 2 | — | Syracuse, Utica |
| 16 | Gotham Bus | 2 | — | Mt. Sinai |
| 17 | Sentinel Data Centers | 2 | 8 | Syracuse, Orangeburg |
| 18 | Clarkson University | 2 | — | Village of Potsdam, Potsdam |
| 19 | Meta | 2 | — | Albany, New York |
| 20 | Colocation America | 2 | 20 | Buffalo, Lockport |
| 21 | Hivelocity | 2 | 2 | Latham, Orangeburg |
| 22 | Continuity Centers | 2 | — | Chappaqua, Woodbury |
| 23 | Sabey Data Centers | 2 | 18 | New York |
| 24 | Telia | 2 | 4 | New York |
| 25 | Equinix | 2 | — | Village of Elmsford, Elmsford |
New York’s Highest-Capacity Facilities
' . htmlspecialchars($cap_names[0]) . ' County tops the capacity ranking at ' . number_format($top_cap[$cap_names[0]]["cap"]) . ' MW. The largest New York facilities are no longer in Manhattan — space and power constraints have pushed hyperscale capacity to the Hudson Valley and upstate, where land is available and utility rates can be one-fifth of ConEdison’s.
| # | Facility | Operator | Location | Capacity | Status |
|---|---|---|---|---|---|
| 1 | Stream Project Double Reed (STAMP) | Stream Data Centers | Alabama, Genesee Co. | 500 MW | Planned |
| 2 | Stream DC Genesee County | Stream Data Centers | Alabama, Genesee Co. | 500 MW | Planned |
| 3 | Cayuga (TeraWulf) | TeraWulf | Tompkins, Tompkins Co. | 400 MW | Planned |
| 4 | TeraWulf AI Data Center Campus, Lansing | TeraWulf | Lansing, Tompkins Co. | 400 MW | Planned |
| 5 | Lake Mariner CB-3 CB-4 CB-5 (TeraWulf) | TeraWulf | Niagara, Niagara Co. | 360 MW | Under Construction |
| 6 | Ranalli Lysander Data Center | Ranalli | Lysander, Onondaga Co. | 300 MW | Planned |
| 7 | Riverview Innovation & Technology Campus | Riverview Innovation & Technology Campus | Tonawanda, Erie Co. | 300 MW | Planned |
| 8 | 1 Gig Data Center East Fishkill | 1 Gig Data Center | East Fishkill, Dutchess Co. | 250 MW | Planned |
| 9 | TeraWulf Lake Mariner | TeraWulf | Barker, Niagara Co. | 205 MW | Operational |
| 10 | Turin Hoefler Avenue LLC | Turin Management | Ilion, Herkimer Co. | 200 MW | Planned |
| 11 | Coinmint (Massena East / former Alcoa Smelter) | Coinmint | Massena, St. Lawrence Co. | 166 MW | Operational |
| 12 | Niagara Digital Campus | Urbacon Data Centre Solutions | Niagara Falls, Niagara Co. | 135 MW | Planned |
| 13 | DigiPowerX North Tonawanda | DigiPower X | North Tonawanda, Niagara Co. | 120 MW | Operational |
| 14 | Greenidge Generation | Greenidge Generation | Dresden, Yates Co. | 106 MW | Operational |
| 15 | Coinmint (NTT Massena) | NTT | Massena, St. Lawrence Co. | 100 MW | Operational |
| 16 | Global AI Endicott | Global AI | Endicott, Broome Co. | 100 MW | Operational |
| 17 | Lake Mariner CB-1 and CB-2 (TeraWulf) | TeraWulf | Niagara, Niagara Co. | 70 MW | Operational |
| 18 | Digihost / Digi Power X — Fortistar North Tonawanda | Digihost (Digi Power X) | North Tonawanda, Niagara Co. | 60 MW | Operational |
| 19 | American Bitcoin — Niagara Falls ("Alpha Site") | American Bitcoin (Hut 8) | Niagara Falls, Niagara Co. | 50 MW | Operational |
| 20 | Blockfusion Niagara Falls Facility (North East Data) | Blockfusion | Niagara Falls, Niagara Co. | 46 MW | Operational |
| 21 | Digihost — Erie County (Buffalo) | Digihost (Digi Power X) | Buffalo, Erie Co. | 42 MW | Operational |
| 22 | DataBank LGA3 (Orangeburg) | DataBank | Orangeburg, Rockland Co. | 40 MW | Operational |
| 23 | Orangeburg (DataBank) | DataBank | Orangeburg, Rockland Co. | 24 MW | Operational |
| 24 | iConnect Missoula (Iron Mountain) | Iron Mountain | Missoula, Lewis Co. | 22 MW | Operational |
| 25 | iConnect Helena (Iron Mountain) | Iron Mountain | Helena, Lewis Co. | 22 MW | Operational |
Climate Mandates and a Bifurcated Pipeline
New York’s pipeline reflects the state’s Climate Leadership and Community Protection Act (CLCPA), which requires 70% renewable electricity by 2030. Operators are shifting toward renewable energy procurement and behind-the-meter generation to comply. The pipeline is bifurcated: high-value, low-latency colocation in NYC proper, and hyperscale campuses in the Hudson Valley and upstate. The ' . number_format($pipeline) . ' facilities in development are weighted toward the latter.
ConEdison vs. Upstate: A 4x Rate Differential
No state has a wider electricity price gap within its borders. ConEdison in NYC charges commercial customers 20–25¢/kWh — the highest rates of any major data center market. Upstate utilities like National Grid and NYSEG charge closer to 6–8¢/kWh, and facilities near Niagara Falls access even cheaper hydroelectric power. This price gradient explains the ongoing migration of price-sensitive workloads upstate, while latency-critical financial applications remain tethered to Manhattan. The NYISO market allows large consumers to hedge costs through forward contracts. Compare current New York electricity rates across utility territories.
Frequently Asked Questions
Why is Manhattan a data center hub despite extreme costs?
Manhattan’s data center market exists because of latency requirements. Financial institutions on Wall Street, media companies, and ad-tech firms need sub-millisecond connectivity to exchanges, content delivery networks, and each other. Carrier hotels like 60 Hudson Street and 111 Eighth Avenue are among the most interconnected buildings in the world. For these customers, the premium of 20–25¢/kWh electricity is justified by the value of proximity.
What happened with New York's crypto mining moratorium?
In November 2022, New York enacted a two-year moratorium on new fossil-fueled proof-of-work cryptocurrency mining operations (S6486D). The law, which expired in 2024, did not affect existing operations or renewable-powered mining. It did not apply to traditional data centers or cloud computing facilities.
How expensive is electricity for New York data centers?
Costs vary dramatically by location. ConEdison in NYC charges commercial customers 20–25¢/kWh, among the highest in the nation. Upstate utilities like National Grid and NYSEG charge closer to 6–8¢/kWh, and facilities near Niagara Falls can access even cheaper hydroelectric power.
What submarine cables connect to New York?
New York and New Jersey host multiple transatlantic submarine cable landing stations connecting to Europe. These cables land at stations in Long Island and northern New Jersey, with backhaul fiber running to Manhattan carrier hotels, making NYC a critical node for international internet traffic.
How many data centers are in New York?
New York has 189 tracked data center facilities across 26 counties. Facilities range from dense colocation hubs in Manhattan to hyperscale campuses in the Hudson Valley and upstate.
Which companies operate the most data centers in New York?
Major operators include Equinix, Digital Realty, DataBank, Sabey Data Centers, CyrusOne, and QTS. Google owns the iconic 111 Eighth Avenue building. In the Hudson Valley, EdgeConneX and Stack Infrastructure are building hyperscale campuses.