New York Data Centers

  • Manhattan’s 60 Hudson Street and 111 Eighth Avenue (now Google-owned) are among the most interconnected buildings on Earth — critical nodes for global internet traffic.
  • ConEdison rates of 20–25¢/kWh make NYC the most expensive data center market in the country, while upstate utilities offer 6–8¢/kWh near Niagara Falls hydropower.
  • A 2022–2024 moratorium on fossil-fueled crypto mining reshaped the upstate pipeline without affecting traditional data centers.

Manhattan Carrier Hotels to Hudson Valley Campuses

New York’s data center geography reflects a stark economic divide. Lower Manhattan hosts iconic carrier hotels — 60 Hudson Street and 111 Eighth Avenue — where financial institutions pay premium rates for sub-millisecond latency to Wall Street. The Hudson Valley has emerged as a lower-cost alternative, with operators in Westchester and Orange counties building campuses that maintain fiber links to NYC at a fraction of Manhattan real estate costs. Upstate New York attracts operators seeking cheap hydroelectric power near Niagara Falls and Syracuse, though the 2022–2024 moratorium on fossil-fueled crypto mining reshuffled some of that pipeline.

New York’s Data Center Counties

' . $county_count . ' New York counties have tracked facilities, spanning from dense urban colocation in Manhattan to hyperscale builds along the I-87 corridor. The split mirrors the state’s broader economic geography: downstate pays for proximity and connectivity; upstate competes on cost and clean energy.

CountyFacilitiesCapacity (MW)Top Operators
New York4945Multi-tenant carrier hotel (Digital Realty, CoreSite, and other carrier/telecom tenants), Multi-tenant carrier hotel (Hudson Interxchange, Digital Realty, DataBank, Equinix, and 100+ telecom tenants), Digital Realty +30 more
Erie17358Digihost (Digi Power X), Frontier, H5 Data Centers +13 more
Niagara141,0569 Lives Digital Group (9LDG), American Bitcoin (Hut 8), Blockfusion +6 more
Albany134Lumen Technologies, Turnkey, Meta +8 more
Westchester13—Equinix, Evocative, TierPoint +7 more
Rockland1296Bloomberg LP, DataBank, fifteenfortyseven Critical Systems Realty +6 more
Suffolk112365 Data Centers, Cable, Gotham Bus +7 more
Onondaga11300Ranalli, Syracuse University, ISafeTECH +6 more
Monroe94Landmax, Lumen Technologies, CentriLogic +5 more
Nassau84Continuity Centers, Crown Castle, Global Enterprise Technologies Inc. +5 more
Kings410Dataverge, Cologix, Industry City Associates +1 more
Genesee31,000Stream Data Centers
St. Lawrence3266Coinmint, NTT, Clarkson University
Dutchess3260IBM, 1 Gig Data Center, CyrusOne
Richmond310Merrill Lynch, Telehouse
Broome3100Lumen, Global AI
Seneca2—FirstLight
Tompkins2800TeraWulf
Lewis245Iron Mountain
Clinton117NewYork GreenCloud
Oneida1—Northland Communications
Franklin1—2CRSi
Saratoga12DotBlock DataCenter
Saint Lawrence1—Clarkson University
Yates1106Greenidge Generation
Herkimer1200Turin Management

Wall Street, Big Tech, and the Latency Premium

New York’s operator mix is unlike any other market. Financial institutions drive demand in Manhattan and northern New Jersey, paying enormous premiums for microseconds of latency advantage. Equinix, Digital Realty, and Sabey Data Centers provide the colocation infrastructure. Google’s ownership of the iconic 111 Eighth Avenue symbolizes big tech’s presence, while the Hudson Valley attracts operators like EdgeConneX and Stack Infrastructure building for NYC-adjacent demand at lower cost.

#OperatorFacilitiesCapacity (MW)Locations
1Lumen13—Albany, Binghamton, New York, Garden City
2Verizon10—New York, Brentwood, Amherst, Rochester
3DataBank885Pearl River, Orangeburg, Briarcliff, Amhurst
4FirstLight6—Albany, Rochester, Romulus, Syracuse
5Lumen Technologies5—Albany, Latham, Buffalo, New York
6TeraWulf51,435Lansing, Barker, Niagara, Tompkins
7Telehouse514New York, Staten Island
8Stream Data Centers41,000Alabama, Syracuse
9Blockfusion346Niagara Falls
10Digital Realty3—New York, Chappaqua
11H5 Data Centers3—Buffalo, Lockport
12TierPoint2—Hawthorne
13FiberMedia2—New York, Chappaqua
14Zayo Group2—New York
15Northland Communications2—Syracuse, Utica
16Gotham Bus2—Mt. Sinai
17Sentinel Data Centers28Syracuse, Orangeburg
18Clarkson University2—Village of Potsdam, Potsdam
19Meta2—Albany, New York
20Colocation America220Buffalo, Lockport
21Hivelocity22Latham, Orangeburg
22Continuity Centers2—Chappaqua, Woodbury
23Sabey Data Centers218New York
24Telia24New York
25Equinix2—Village of Elmsford, Elmsford

New York’s Highest-Capacity Facilities

' . htmlspecialchars($cap_names[0]) . ' County tops the capacity ranking at ' . number_format($top_cap[$cap_names[0]]["cap"]) . ' MW. The largest New York facilities are no longer in Manhattan — space and power constraints have pushed hyperscale capacity to the Hudson Valley and upstate, where land is available and utility rates can be one-fifth of ConEdison’s.

#FacilityOperatorLocationCapacityStatus
1Stream Project Double Reed (STAMP)Stream Data CentersAlabama, Genesee Co.500 MWPlanned
2Stream DC Genesee CountyStream Data CentersAlabama, Genesee Co.500 MWPlanned
3Cayuga (TeraWulf)TeraWulfTompkins, Tompkins Co.400 MWPlanned
4TeraWulf AI Data Center Campus, LansingTeraWulfLansing, Tompkins Co.400 MWPlanned
5Lake Mariner CB-3 CB-4 CB-5 (TeraWulf)TeraWulfNiagara, Niagara Co.360 MWUnder Construction
6Ranalli Lysander Data CenterRanalliLysander, Onondaga Co.300 MWPlanned
7Riverview Innovation & Technology CampusRiverview Innovation & Technology CampusTonawanda, Erie Co.300 MWPlanned
81 Gig Data Center East Fishkill1 Gig Data CenterEast Fishkill, Dutchess Co.250 MWPlanned
9TeraWulf Lake MarinerTeraWulfBarker, Niagara Co.205 MWOperational
10Turin Hoefler Avenue LLCTurin ManagementIlion, Herkimer Co.200 MWPlanned
11Coinmint (Massena East / former Alcoa Smelter)CoinmintMassena, St. Lawrence Co.166 MWOperational
12Niagara Digital CampusUrbacon Data Centre SolutionsNiagara Falls, Niagara Co.135 MWPlanned
13DigiPowerX North TonawandaDigiPower XNorth Tonawanda, Niagara Co.120 MWOperational
14Greenidge GenerationGreenidge GenerationDresden, Yates Co.106 MWOperational
15Coinmint (NTT Massena)NTTMassena, St. Lawrence Co.100 MWOperational
16Global AI EndicottGlobal AIEndicott, Broome Co.100 MWOperational
17Lake Mariner CB-1 and CB-2 (TeraWulf)TeraWulfNiagara, Niagara Co.70 MWOperational
18Digihost / Digi Power X — Fortistar North TonawandaDigihost (Digi Power X)North Tonawanda, Niagara Co.60 MWOperational
19American Bitcoin — Niagara Falls ("Alpha Site")American Bitcoin (Hut 8)Niagara Falls, Niagara Co.50 MWOperational
20Blockfusion Niagara Falls Facility (North East Data)BlockfusionNiagara Falls, Niagara Co.46 MWOperational
21Digihost — Erie County (Buffalo)Digihost (Digi Power X)Buffalo, Erie Co.42 MWOperational
22DataBank LGA3 (Orangeburg)DataBankOrangeburg, Rockland Co.40 MWOperational
23Orangeburg (DataBank)DataBankOrangeburg, Rockland Co.24 MWOperational
24iConnect Missoula (Iron Mountain)Iron MountainMissoula, Lewis Co.22 MWOperational
25iConnect Helena (Iron Mountain)Iron MountainHelena, Lewis Co.22 MWOperational

Climate Mandates and a Bifurcated Pipeline

New York’s pipeline reflects the state’s Climate Leadership and Community Protection Act (CLCPA), which requires 70% renewable electricity by 2030. Operators are shifting toward renewable energy procurement and behind-the-meter generation to comply. The pipeline is bifurcated: high-value, low-latency colocation in NYC proper, and hyperscale campuses in the Hudson Valley and upstate. The ' . number_format($pipeline) . ' facilities in development are weighted toward the latter.

ConEdison vs. Upstate: A 4x Rate Differential

No state has a wider electricity price gap within its borders. ConEdison in NYC charges commercial customers 20–25¢/kWh — the highest rates of any major data center market. Upstate utilities like National Grid and NYSEG charge closer to 6–8¢/kWh, and facilities near Niagara Falls access even cheaper hydroelectric power. This price gradient explains the ongoing migration of price-sensitive workloads upstate, while latency-critical financial applications remain tethered to Manhattan. The NYISO market allows large consumers to hedge costs through forward contracts. Compare current New York electricity rates across utility territories.

Frequently Asked Questions

Why is Manhattan a data center hub despite extreme costs?

Manhattan’s data center market exists because of latency requirements. Financial institutions on Wall Street, media companies, and ad-tech firms need sub-millisecond connectivity to exchanges, content delivery networks, and each other. Carrier hotels like 60 Hudson Street and 111 Eighth Avenue are among the most interconnected buildings in the world. For these customers, the premium of 20–25¢/kWh electricity is justified by the value of proximity.

What happened with New York's crypto mining moratorium?

In November 2022, New York enacted a two-year moratorium on new fossil-fueled proof-of-work cryptocurrency mining operations (S6486D). The law, which expired in 2024, did not affect existing operations or renewable-powered mining. It did not apply to traditional data centers or cloud computing facilities.

How expensive is electricity for New York data centers?

Costs vary dramatically by location. ConEdison in NYC charges commercial customers 20–25¢/kWh, among the highest in the nation. Upstate utilities like National Grid and NYSEG charge closer to 6–8¢/kWh, and facilities near Niagara Falls can access even cheaper hydroelectric power.

What submarine cables connect to New York?

New York and New Jersey host multiple transatlantic submarine cable landing stations connecting to Europe. These cables land at stations in Long Island and northern New Jersey, with backhaul fiber running to Manhattan carrier hotels, making NYC a critical node for international internet traffic.

How many data centers are in New York?

New York has 189 tracked data center facilities across 26 counties. Facilities range from dense colocation hubs in Manhattan to hyperscale campuses in the Hudson Valley and upstate.

Which companies operate the most data centers in New York?

Major operators include Equinix, Digital Realty, DataBank, Sabey Data Centers, CyrusOne, and QTS. Google owns the iconic 111 Eighth Avenue building. In the Hudson Valley, EdgeConneX and Stack Infrastructure are building hyperscale campuses.